Wilson Way pulls all permits and schedules all inspections. Here's what to expect in Bullitt County.

Bullitt County Planning and Zoning in Shepherdsville issues residential permits on paper, and review runs 1 to 3 weeks, the shortest clock we work against in the region. Permit fees land between 0.4% and 0.8% of project value, and a typical project takes 3 to 5 inspections. The codes are IRC 2018 with the Kentucky Residential Code, the same set Metro enforces.

The turnaround is short because the review load is lighter and simple projects get looked at quickly. The paperwork is physical. Applications go in on paper to 300 S. Buckman Street, 8am to 4:30pm Monday through Friday. We deliver them ourselves and follow up in person, so you can stand in front of the person reading your drawings and get a straight answer.

Plan around one thing. If your project sits on a lot with a septic system or a well, that permitting is a separate track run by the health department and it does not ride along with the building permit. We open both at the same time so they clear together.

The process

From first walk to final certificate.

  1. Site walk and scope check

    You and we, on site

    We measure and check whether the lot needs septic, well, or other separate approval.

  2. Drawings and engineered plans

    Our design-build team, plus an engineer when needed

    Structural, electrical, plumbing, and HVAC work goes to the county as one set.

  3. Paper application delivered

    We

    Hand delivered to 300 S. Buckman Street during office hours, and we leave with a stamped copy.

  4. Plan review and corrections

    Bullitt County plan reviewer

    Checked against IRC 2018 and the Kentucky Residential Code. We resubmit corrections.

  5. Permit issuance and fee payment

    Bullitt County

    Fees of 0.4% to 0.8% of project value are due before the permit is active, covered in your contract.

  6. Construction and inspections

    Our lead carpenter on site, our project manager scheduling

    We request each inspection, meet the inspector, and fix what gets flagged.

  7. Final inspection and certificate

    Bullitt County inspector

    The final pass issues the certificate of occupancy.

Inspection points

What gets checked, and when.

Footing

Before the pour

Excavation depth, footing size, rebar placement and cover, drainage slope.

Framing

After framing, before drywall

Nailing, headers, hold downs, match to approved drawings.

Rough-in

After electrical, plumbing, and HVAC rough-in, before insulation

Wiring, box fill, pipe slope, venting, drain sizing.

Insulation

After insulation and vapor barrier, before drywall

Rvalues in walls, attic, and crawl space, plus air sealing.

Final

After all trades finish and the site is cleaned

Fixtures, devices, guardrails, egress windows, alarms, remaining code items.

What gets rejected

The six things that fail inspection here.

  • Footing poured before the inspection. Fastest inspection to fail and most expensive to fix, because the concrete comes out. We hold the pour.
  • Septic or well approval not in hand when the building permit issues. We track both permits as one schedule item.
  • Rough-in buried before inspection. It saves a day and costs you a wall later, so we keep it open until it passes.
  • Guardrails and handrails missing on a stair or change in level. Cheap while framing is open, expensive after.
  • Smoke and carbon monoxide alarms not tested before the final walkthrough. We activate every device ourselves.
  • Changing the layout after approval without an amendment. The county can pull the permit and make you resubmit.
Your side

What Bullitt County asks the homeowner to do.

  • Tell us early if the lot has a septic system or a well, because that track runs on the health department clock.
  • Decide the layout before drawings start. Fixture counts and locations decide the plumbing rough-in.
  • Share what you do not like about the existing space so the design can fix it.
  • Keep the site accessible on inspection days so the inspector can reach the footing, attic, and panels.
  • Photograph existing finishes before demolition, trim and tile especially.
  • Allow 1 to 3 weeks for review. Starting work early is how the schedule slips.
  • Pay on the agreed schedule and read what you sign.
Unpermitted work

Skip the permit and you are betting the sale of the house.

Unpermitted work can be opened up. An inspector who cannot see inside a wall can require that wall to come off, and in a bathroom that means the shower surround. You pay to take it apart and to put it back, on the inspector's timing.

The bill arrives later if you never deal with it. A buyer or lender will ask for a certificate of occupancy, and a house without one stalls the sale or closes with money held back. If work is inside a wall you cannot account for, call us and we will tell you what bringing it current costs.

Questions

Permit questions we get asked.

Is a Bullitt County permit really faster than Louisville Metro?

For simple residential work, yes. Review runs 1 to 3 weeks here against 2 to 4 weeks in Jefferson County, and the county takes paper applications at a counter rather than routing everything through a portal. The codes are identical, so speed is the difference, not standard. Files with structural changes still take longer.

Why are permit applications still on paper?

Bullitt County Planning and Zoning processes applications in person at 300 S. Buckman Street, Monday through Friday, 8am to 4:30pm. That has a practical advantage for us. We deliver the set, talk to the reviewer face to face about corrections, and often resolve a question in a minute that would sit in a portal ticket for a week.

Do I need a separate permit for a septic system or well?

Yes. Bullitt County handles septic and well permits through the health department, separately from the building permit. Both tracks can run at the same time but neither waits on the other automatically. We open them together so a build is not sitting on an approved footprint with an unapproved system behind it.

How much do permits cost in Bullitt County?

Permit fees run 0.4% to 0.8% of project value, at the lower end of what we see in the metro area. Those fees are included in the contract price we give you. You will not get a bill from the county for a permit we pulled, and you will not be asked to chase an inspection on your own.

Permit timeline
1-3 weeks for residential projects
Permit cost
0.4%-0.8% of project value
Inspections per project
3-5 typical
Online application?
Paper only
Permitting office

Bullitt County Planning & Zoning

Address: 300 S. Buckman Street, Shepherdsville, KY 40165

Phone: (502) 955-7377

Hours: Mon-Fri 8am-4:30pm

Applications: Paper applications only

What Wilson Way handles

You don't lift a finger.

As part of every contract, Wilson Way:

  • Pulls all permits required for your project
  • Submits engineered plans when required
  • Schedules all inspections and is on-site for each
  • Coordinates with inspectors to resolve any issues
  • Files the final certificate of occupancy when work is complete
  • Includes permit fees in your contract, no surprise add-ons
Bullitt County-specific notes

What makes Bullitt County different.

  • Faster turnaround than Jefferson County for simple projects
  • Same building codes (IRC 2018 + Kentucky Residential Code)
  • Septic + well permits handled separately by health department
  • Wilson Way has strong relationships with Bullitt County inspectors
What to expect

The inspection timeline.

For a typical Bullitt County residential project, here is the inspection sequence:

  1. Footing inspection, before we pour concrete. Verifies depth + rebar placement.
  2. Framing inspection, after framing is up, before drywall. Verifies structural integrity.
  3. Rough-in inspections, electrical, plumbing, mechanical (HVAC). All three typically same week.
  4. Insulation inspection, after insulation is installed, before drywall.
  5. Final inspection, after all work is complete. Issues Certificate of Occupancy (CO).

Wilson Way's lead carpenter is on-site for every inspection. Average inspection: 30 minutes. No re-inspections on our projects.

Ready to start your Bullitt County project?

Wilson Way handles every permit, every inspection, every county.