A whole-home remodel is not a bigger kitchen. It is a house whose systems, openings, and finishes all have to work at the same time, and the value of doing them together is that each trade stops interfering with the others. We take on full-gut renovations of Louisville and Southern Indiana houses, including the ones from the 1920s through the 1970s that need their wiring and plumbing brought forward.

What's included

Every full home remodel project includes:

  • ✓ Whole-home layout reconfigurations
  • ✓ Structural modifications + load-bearing removals
  • ✓ HVAC, electrical, plumbing upgrades
  • ✓ Window + exterior door replacement
  • ✓ New trim, doors, flooring, paint throughout
What to expect

The process

01

Survey and budget band

A longer walk-through than a single room project, including the attic and the crawl space if there is one. You get a budget band for the tier of renovation you have described, and an honest note about the unknowns we can already see.

02

Design, engineering, and permits

Drawings first, then any structural engineering the house needs, then the permit application. We do not open a wall that a drawing does not already describe.

03

Demolition and rough-in

Strip, assess the structure, correct the load path, and run electrical, plumbing, and HVAC in a coordinated sequence. Weekly owner’s meetings and a written change log from here on.

04

Finishes and punch list

Drywall, paint, floors, cabinets, and finish carpentry, then a documented punch list and a one-year workmanship warranty on the work we did.

What a whole-home remodel actually involves

The scope of a full-gut renovation is usually longer than the list of rooms. Stripping the interior exposes the framing, and what the framing is doing decides how much of the house has to move. A house from 1925 might have knob-and-tube wiring in the walls and a fuse box in the hallway, and if you are opening the walls anyway, replacing the electrical is a decision you either make once or pay for twice. Plumbing in a 1940s house is usually galvanized steel, which has a finite life and a specific failure mode. We sequence the work so that the mechanical systems — electrical, plumbing, HVAC, and sometimes the water heater and main service — get resolved before any finish work happens, because chasing a vent or a circuit after the drywall is up costs several times what it costs during rough-in. That sequencing is the single biggest determinant of whether a whole-home remodel finishes on time.

Order of operations on a full gut

A full-home remodel we run in this area follows a fairly fixed sequence. First the house is protected and stripped to the studs, or to the plaster where the plaster is worth saving. Then the structure is assessed and any load path is corrected, which on older houses sometimes means a beam where a wall used to be. Then the rough-in trades run: electrical, plumbing, and HVAC, coordinated against a single plan so no one drills a hole through someone else’s duct. Then insulation and air sealing, because an old house leaks more heat through its walls than through its windows. Then drywall, then trim and paint, then floors, then cabinets and counters, then the finish carpentry. Every one of those stages has a dependency, and a good schedule is one where each trade arrives the day the previous trade made their work possible rather than the day the client is ready.

What we find in older Louisville and Southern Indiana houses

Houses built before 1960 in this area carry a specific set of surprises, and we have learned to look for them. Floor joists are often 2x6 on a span that needs 2x10, which shows up as deflection and squeak underfoot and sometimes as a plaster crack that homeowners blame on settling. Plaster walls from the 1930s and 1940s are often lath and plaster over a masonry or hollow structure, and they cannot be insulated without being opened. Some houses have been re-plastered over lath at least twice, which is expensive to strip and often cheaper to replace with drywall on the same walls. Uninsulated crawl spaces and unconditioned attic space put the heating and cooling load exactly where the money is going. And a surprising number of houses in this region have been added to in ways that were never permitted, so the existing footprint does not always match the tax record. We photograph and document what we find before we price the surprises.

How we price a whole-home renovation

A whole-home remodel is priced by scope, and the scope is not knowable from the outside, so we do not publish a per-square-foot number as if it were a quote. What we do is give you a budget band for the tier of renovation you describe — a cosmetic rewire of finishes, a full gut with new systems, or a structural renovation with reconfigured rooms — and then we convert that band into a fixed price once the design is done and the walk-through has happened. Two houses of identical square footage in the same neighborhood can differ by a factor of two in renovation cost depending on the plaster, the wiring, the foundation, and how many walls carry load. If you are weighing a remodel against moving, our article on the Louisville math compares what selling, buying, and remodeling actually cost, because the answer changes completely if the house you would buy is the one you are standing in.

How long it takes and how we keep it moving

On paper a full gut runs twelve to twenty weeks for a house of this size in our area, and the honest version is that the schedule is set by the rough-in and the finishes, not by the demolition. Demolition is fast and noisy. Framing and rough-in are the parts that slip, because that is where the unknowns surface and where a decision has to be made in the field. We hold a weekly owner’s meeting during those weeks, keep a written change log so any change to scope is a documented decision with a price attached, and put a dated schedule in the contract with milestone draws tied to it. We also keep a punch list rather than pretending a renovation ends the day the last cabinet goes in. There is always a list, and having it in writing is how it gets closed.

Full Home Remodels, Wilson Way Louisville KY
Budget reality

What full home remodel projects actually cost in Louisville.

A full gut on a house this size runs about twelve to twenty weeks, and we quote a budget band rather than a per-square-foot number because the plaster, the wiring, and the foundation move the price more than the square footage does. The fixed price comes after the design and the walk-through.

Refresh
$80K - $120K

Cosmetic updates: new fixtures, finishes, and minor reconfigurations.

Premium
$250K - $450K

Custom design-build with structural changes and premium materials.

Full tier-by-tier breakdown for full home remodel projects in Louisville: see our pricing page.

Every project includes permits, inspections, and cleanup. No surprise line items.

Common questions

Frequently asked

How much does a full home remodel cost in Louisville KY?

A whole-home remodel in Louisville runs $100-$200 per square foot for mid-range work. A 2,000 sq ft home: $200K-$400K. Luxury finishes + structural changes: $300-$500+ per sq ft.

How long does a full home remodel take?

Single-story 1,500 sq ft: 4-5 months. Two-story 2,000-2,500 sq ft: 5-7 months. Two-story 3,000+ sq ft: 7-10 months. Sequencing by floor + room is the key to staying on schedule.

Do I need to move out during a whole-home remodel?

Usually yes for projects over $200K or longer than 4 months. We can phase the work to keep parts of the house livable — typically one zone at a time. We will plan the phasing with you upfront.

Remodel or buy new?

If you love your location (school district, neighbors, commute) and the bones are good (foundation, roof, structure), remodel is usually cheaper and less disruptive than moving. If the foundation is failing, the lot is wrong, or you need 2x the space, moving is usually the right call.

What order do you remodel in?

Top-down, structural-first: framing + structural changes → rough-in plumbing + electrical + HVAC → drywall + insulation → trim + cabinets → paint → flooring → fixtures + finishes. We phase rooms to minimize total project duration.

Can you keep any of the existing features?

Yes. Hardwood floors (if salvageable), original trim, brick fireplaces, mid-century built-ins — we can often preserve and refinish these. We will identify keep-vs-replace in the planning phase.

How do you handle surprises during construction?

Louisville homes built before 1980 commonly have surprises behind walls: knob-and-tube wiring, cast iron drain lines, asbestos insulation, settling foundation. We document with photos, price transparently, and get your approval before proceeding.

What is the most common scope you skip on whole-home remodels?

Foundation work. If the existing foundation is sound, we keep it. If it needs reinforcement, we add it as an extra. We do not recommend skipping electrical panel upgrades, even to save cost — 200-amp is the new standard.

Read all full home remodels questions and answers →