Louisville Metro issues residential permits through its Department of Codes and Regulations at 444 S. 5th Street, and we pull them for you. Review runs 2 to 4 weeks, permit fees land between 0.5% and 1% of project value, and a typical project takes 3 to 5 inspections. Applications go through the Citizen Access Portal. The codes are IRC 2018 with the Kentucky Residential Code.

Metro reviews plans before anyone breaks ground, and that works in your favor. Corrections to drawings cost a phone call. Corrections to a wall cost a demolition. Two things stretch the clock: a historic district property such as Old Louisville or Limerick needs Landmarks Commission review on top of Metro review, and same-day permits exist for minor work.

What homeowners miss is what happens after approval. A permit is a sequence, and skipping a step is what leaves a house with no certificate of occupancy. We pull the permit, submit engineered plans when the scope needs them, schedule every inspection, and file the final certificate.

The process

From first walk to final certificate.

  1. Site walk and scope check

    You and we, on site

    We measure the space and flag anything needing engineering or zoning.

  2. Drawings and engineered plans

    Our design-build team, plus an engineer when needed

    Structural, electrical, plumbing, and HVAC sheets go to Metro as one package.

  3. Permit application submitted

    We

    Filed through the Citizen Access Portal with our office as the responsible party.

  4. Plan review and corrections

    Metro plan reviewer

    Checked against IRC 2018 and the Kentucky Residential Code. We handle corrections.

  5. Permit issuance and fee payment

    Metro

    Fees of 0.5% to 1% of project value are due before the permit is active, inside your contract.

  6. Construction and inspections

    Our lead carpenter on site, our project manager scheduling

    Footing, framing, rough-in, insulation, and final inspections are scheduled by us.

  7. Final inspection and certificate

    Metro inspector

    The certificate of occupancy is filed once the final passes.

Inspection points

What gets checked, and when.

Footing

Before concrete is poured

Excavation depth, footing width, rebar placement and cover, drainage slope.

Framing

After framing and roof sheathing, before drywall

Nailing patterns, header sizes, hold downs, match to approved drawings.

Rough-in

After electrical, plumbing, and HVAC rough-in, before insulation

Wiring, box fill, pipe slope, venting, drain sizing.

Insulation

After insulation and vapor barrier, before drywall

Rvalues in walls, attic, and floor, plus air sealing.

Final

After all trades finish and the site is clean

Fixtures, devices, guardrails, egress windows, smoke and CO alarms, remaining code items.

What gets rejected

The six things that fail inspection here.

  • Footing depth and rebar cover off spec. The pour gets held. We set the excavation and bar layout to the approved detail first.
  • Rough-in covered before it is inspected, which means opening finished walls later. We never bury work nobody has seen.
  • Smoke and carbon monoxide alarms missing at the final. A failed final over a device that costs a few dollars means a second trip.
  • Guardrail height and handrail returns missing on a stair. Common when a renovation changes a ceiling height. We check during framing.
  • Electrical and HVAC work with no trade permit. We pull those too, so the final has something to inspect.
  • A window or door relocated after issuance. The plan no longer matches the wall, so an amended permit can be required.
Your side

What Jefferson County (Louisville Metro) asks the homeowner to do.

  • Decide what the work has to accomplish before drawings start. Fixture counts, whether the tub stays.
  • Tell us what you have been living with. The drafty window, the tub that never drains.
  • Give us a survey or recorded plat when the project touches a lot line or setback.
  • Keep the path to the work clear on inspection day and keep pets inside.
  • Photograph anything you care about before demolition, trim and tile especially.
  • Give the permit clock room. Review is 2 to 4 weeks in Metro and starting early risks the schedule.
  • Pay on the schedule we agree to and read what you sign.
Unpermitted work

Unpermitted work is a sale problem before it is a fine problem.

Work that goes in without a permit can be opened up. An inspector who cannot see inside a wall can require that wall to come off, and on a bathroom that means the shower surround. You pay for the demolition and again for the rebuild.

Then it becomes a sale problem. A buyer or lender asks for a certificate of occupancy, and a house without one either stalls the sale or closes with money held back. If work is inside a wall and you are not sure, call us and we will tell you what bringing it current costs.

Questions

Permit questions we get asked.

How long does a permit take in Louisville Metro?

Metro runs 2 to 4 weeks for residential projects from application to issuance, and most of that is plan review. Files with structural changes or historic district properties take longer. The fastest path is a complete set of drawings submitted once, which is how we submit. Construction adds its own length afterward.

Who pays the permit fees?

We do, out of your contract. Fees in Jefferson County run 0.5% to 1% of project value and they are part of the price we quoted you. A contractor who asks you to pay the county directly is usually also asking you to handle inspections and corrections afterward.

Do you pull permits for electrical and HVAC as well?

Yes. Any trade that needs a permit gets one, and the rest still follows the current code. Electrical, plumbing, and mechanical rough-ins are all inspected in Jefferson County, where most residential projects see 3 to 5 inspections. Skipping that paperwork puts your certificate of occupancy at risk.

Can you handle a project in an Old Louisville historic district?

Yes. Properties in historic districts need additional review by the Landmarks Commission on top of Metro review, and that adds time we cannot compress. The work often has to meet standards for windows, siding, and roof profile beyond the residential code. We build that review into the schedule first.

Permit timeline
2-4 weeks for residential projects
Permit cost
0.5%-1% of project value
Inspections per project
3-5 typical
Online application?
Yes
Permitting office

Louisville Metro Department of Codes & Regulations

Address: 444 S. 5th Street, Louisville, KY 40202

Phone: (502) 574-3325

Hours: Mon-Fri 8am-5pm

Applications: Online permit application via Louisville Metro Citizen Access Portal

What Wilson Way handles

You don't lift a finger.

As part of every contract, Wilson Way:

  • Pulls all permits required for your project
  • Submits engineered plans when required
  • Schedules all inspections and is on-site for each
  • Coordinates with inspectors to resolve any issues
  • Files the final certificate of occupancy when work is complete
  • Includes permit fees in your contract, no surprise add-ons
Jefferson County (Louisville Metro)-specific notes

What makes Jefferson County (Louisville Metro) different.

  • Historic District properties (Old Louisville, Limerick, etc.) require additional review by the Landmarks Commission
  • Louisville Metro uses IRC 2018 + Kentucky Residential Code
  • Energy code compliance verified at plan review
  • Same-day permits available for minor work (water heater, electrical panel)
What to expect

The inspection timeline.

For a typical Jefferson County (Louisville Metro) residential project, here is the inspection sequence:

  1. Footing inspection, before we pour concrete. Verifies depth + rebar placement.
  2. Framing inspection, after framing is up, before drywall. Verifies structural integrity.
  3. Rough-in inspections, electrical, plumbing, mechanical (HVAC). All three typically same week.
  4. Insulation inspection, after insulation is installed, before drywall.
  5. Final inspection, after all work is complete. Issues Certificate of Occupancy (CO).

Wilson Way's lead carpenter is on-site for every inspection. Average inspection: 30 minutes. No re-inspections on our projects.

Ready to start your Jefferson County (Louisville Metro) project?

Wilson Way handles every permit, every inspection, every county.

Schedule a Free Consult