Surface-level refresh
What's included
- All new flooring
- All new paint
- All new fixtures + hardware
- Kitchen cosmetic refresh
- Bath cosmetic refresh
Not included
- Layout changes
- Electrical upgrade
- HVAC replacement
- Major plumbing
Real 2024-2025 Louisville pricing, not national averages. 4 tiers, broken out.
Mid-range full remodel. Below 100/sf is cosmetic only. Above 200/sf is luxury.
Pre-1980 homes often have surprises: knob-and-tube wiring, cast iron drains, asbestos, settling foundation.
200-amp electrical, new HVAC, new water heater, new plumbing supply lines. Required for any deep remodel.
If foundation is sound: $0. If needs reinforcement or piering: $20-50K+. We assess before contract.
Whole-home remodel pulls 5-10 permits + 15-25 inspections. Wilson Way handles all of it.
A whole-home remodel in Louisville runs $100 to $200 per square foot for mid-range work. A 1,500 sq ft house gets a surface refresh for $80K to $120K, a mid-range full gut for $120K to $250K, and a deep rebuild with layout changes and new systems for $250K to $450K. Most houses we gut run 1,800 to 2,500 sq ft, so plan on $200K to $400K.
The range spreads because of what we find once the drywall comes down. Pre-1980 houses in St. Matthews, Jeffersontown, and Old Louisville often carry knob-and-tube wiring, cast iron drains, or asbestos that must be handled. Then the systems bill arrives on its own, since a 200-amp upgrade, new HVAC, a new water heater, and new supply lines run $40K to $80K combined.
Get the house assessed before you collect three bids. We walk the space, check the foundation and the electrical panel, and tell you which of the four scopes you are really shopping for. That assessment separates a real proposal from a number pulled off a website, and it comes with the work when you hire us to build the project.
Flooring, paint, fixtures, cosmetic kitchen.
New kitchen, two baths, new systems, HVAC.
Layout changes, all new systems, finishes.
Custom cabinetry, high-end fixtures, structure.
Deep scope plus addition square footage.
Drawings, permits, foundation assessment.
Demo, framing, load-bearing work.
Drain lines, panel, circuits, ductwork.
Insulation, board, casing, cabinets, paint.
Flooring, tile, fixtures, inspections, cleanup.
Value shows up in two places. The first is resale. A house with a new kitchen, new wiring, and new HVAC sells faster than the same house with a tired kitchen and a 100-amp panel.
The second is monthly. Replacing a furnace that fails every January and redoing a bathroom you dislike has a return that never shows in a sale price but arrives every month you make the payment.
Payback depends on scope and on the resale market when you sell. A cosmetic refresh can return most of its cost at sale. A deep rebuild returns less money and buys more in daily use.
Some parts of a whole-home remodel suit a homeowner with the time and the tools. Painting bedrooms after the trades clear out, patching drywall, replacing a fixture, or installing shelving are jobs you can do well and that we are glad to leave for you.
The parts that look like DIY are the ones that cost the most when they go wrong. Rewiring a panel, running a new drain line, or reframing a load-bearing wall is not a weekend in a house with knob-and-tube wiring.
That rate buys a mid-range scope: a new kitchen with semi-custom cabinets and quartz, two full bath remodels, all new flooring and paint, a 200-amp upgrade, and new HVAC. It excludes custom cabinetry, load-bearing wall changes, and foundation work, so two bids at that rate can still sit $80K apart.
Budget 1 to 2% of project value. A whole-home remodel pulls 5 to 10 permits and 15 to 25 inspections in Jefferson County, and each one must be scheduled and passed before the next trade starts. We file every permit and schedule the inspections.
Compare scope line by line, not totals. If one bid omits the panel, the HVAC, the drywall hang, or the final paint, the low number is not a better price. Ask each contractor for the drawing or cut list they priced from.
Yes. We phase by floor and room so one zone stays livable while we work the next, which keeps a family in place and splits the draw schedule across months. Projects over $200K or longer than four months usually need that plan.
Our cost calculator uses Louisville-specific data. Walk through 4 questions and get a range based on real Louisville project bids from 2024-2025.
Try the Cost CalculatorOr skip the calculator and schedule a free 30-minute in-home consultation, we will walk your actual space and give you a real range within a week.
Free 30-minute consultation. Real Louisville pricing, real timeline.
Schedule a Free Consult