Full Home Remodel work by Wilson Way
Full Home Remodel pricing

How much does full home remodel cost in Louisville?

Real 2024-2025 Louisville pricing, not national averages. 4 tiers, broken out.

Pricing tiers

The four scopes we see most often.

Surface-level refresh

$80K – $120K

What's included

  • All new flooring
  • All new paint
  • All new fixtures + hardware
  • Kitchen cosmetic refresh
  • Bath cosmetic refresh

Not included

  • Layout changes
  • Electrical upgrade
  • HVAC replacement
  • Major plumbing

Mid-range full

$120K – $250K

What's included

  • Kitchen full gut (mid-range)
  • 2 baths full gut (mid-range)
  • All new flooring + paint
  • 200-amp electrical upgrade
  • New HVAC

Not included

  • Layout changes
  • Addition
  • Custom cabinetry
  • High-end finishes

Whole-home deep

$250K – $450K

What's included

  • Kitchen full gut (premium)
  • All baths full gut
  • Layout reconfiguration
  • All new systems
  • Premium finishes throughout

Not included

  • Foundation work
  • Addition
  • Structural changes to exterior

Gut + addition

$450K – $800K+

What's included

  • Whole-home deep
  • +
  • Addition (per sq ft)
  • +
  • Premium everything

Not included

  • New construction on raw land (that is custom home pricing)
Cost factors

What moves the number up or down.

Square footage

$100-200/sf

Mid-range full remodel. Below 100/sf is cosmetic only. Above 200/sf is luxury.

Age of home

+10-30%

Pre-1980 homes often have surprises: knob-and-tube wiring, cast iron drains, asbestos, settling foundation.

Systems

$40-80K

200-amp electrical, new HVAC, new water heater, new plumbing supply lines. Required for any deep remodel.

Foundation

$0 – $50K+

If foundation is sound: $0. If needs reinforcement or piering: $20-50K+. We assess before contract.

Permits + inspections

1-2%

Whole-home remodel pulls 5-10 permits + 15-25 inspections. Wilson Way handles all of it.

A whole-home remodel in Louisville runs $100 to $200 per square foot for mid-range work. A 1,500 sq ft house gets a surface refresh for $80K to $120K, a mid-range full gut for $120K to $250K, and a deep rebuild with layout changes and new systems for $250K to $450K. Most houses we gut run 1,800 to 2,500 sq ft, so plan on $200K to $400K.

The range spreads because of what we find once the drywall comes down. Pre-1980 houses in St. Matthews, Jeffersontown, and Old Louisville often carry knob-and-tube wiring, cast iron drains, or asbestos that must be handled. Then the systems bill arrives on its own, since a 200-amp upgrade, new HVAC, a new water heater, and new supply lines run $40K to $80K combined.

Get the house assessed before you collect three bids. We walk the space, check the foundation and the electrical panel, and tell you which of the four scopes you are really shopping for. That assessment separates a real proposal from a number pulled off a website, and it comes with the work when you hire us to build the project.

Cost per square foot

Cost per square foot, by how deep the scope goes.

Surface refresh, no layout changes

Under $100 per sq ft

Flooring, paint, fixtures, cosmetic kitchen.

Mid-range full gut

$100 to $200 per sq ft

New kitchen, two baths, new systems, HVAC.

Deep rebuild with layout changes

$125 to $225 per sq ft

Layout changes, all new systems, finishes.

Luxury whole-home scope

$225 per sq ft and up

Custom cabinetry, high-end fixtures, structure.

Gut plus addition

$450K to $800K and up

Deep scope plus addition square footage.

Timeline

A 1,500 sq ft single-story gut takes 4 to 5 months.

Design and permits

4 to 8 weeks

Drawings, permits, foundation assessment.

Demolition and structural

2 to 3 weeks

Demo, framing, load-bearing work.

Rough-in plumbing, electrical, HVAC

3 to 5 weeks

Drain lines, panel, circuits, ductwork.

Drywall, trim, cabinets, paint

4 to 6 weeks

Insulation, board, casing, cabinets, paint.

Flooring, fixtures, punch

2 to 4 weeks

Flooring, tile, fixtures, inspections, cleanup.

Return

What a remodel actually gives you back.

Value shows up in two places. The first is resale. A house with a new kitchen, new wiring, and new HVAC sells faster than the same house with a tired kitchen and a 100-amp panel.

The second is monthly. Replacing a furnace that fails every January and redoing a bathroom you dislike has a return that never shows in a sale price but arrives every month you make the payment.

Payback depends on scope and on the resale market when you sell. A cosmetic refresh can return most of its cost at sale. A deep rebuild returns less money and buys more in daily use.

What you get

What our contract covers.

  • ✓ Scope drawings developed before you sign
  • ✓ All permits filed and tracked
  • ✓ Inspection scheduling for every trade
  • ✓ General contracting and daily supervision
  • ✓ Subcontractor coordination and sequencing
  • ✓ Written scope for electrical, HVAC, plumbing upgrades
  • ✓ Kentucky Residential Code compliance
  • ✓ Weekly written progress updates
  • ✓ Final cleanup and debris haul-off
  • ✓ One-year workmanship warranty
Comparing bids

Six signs a bid is going to go wrong.

  • → A price per square foot with no scope attached. $150 per square foot means nothing until you know about the panel and HVAC.
  • → No itemized labor line, so you cannot check the rate.
  • → Permits left as your job, which puts every fee and delay on you.
  • → Nothing written about the electrical panel. A full gut is the moment to fix a 100-amp service.
  • → Change orders priced without written approval before work starts.
  • → A fixed price before anyone has opened a wall. On a pre-1980 house, that cannot hold.
Doing it yourself

Where a homeowner can save money honestly.

Some parts of a whole-home remodel suit a homeowner with the time and the tools. Painting bedrooms after the trades clear out, patching drywall, replacing a fixture, or installing shelving are jobs you can do well and that we are glad to leave for you.

The parts that look like DIY are the ones that cost the most when they go wrong. Rewiring a panel, running a new drain line, or reframing a load-bearing wall is not a weekend in a house with knob-and-tube wiring.

  • ✓ Painting and drywall patching after the trades leave
  • ✓ Fixture swaps and shelving in rooms we finish
Questions

Cost questions we get asked.

What does $200 per square foot include on a Louisville remodel?

That rate buys a mid-range scope: a new kitchen with semi-custom cabinets and quartz, two full bath remodels, all new flooring and paint, a 200-amp upgrade, and new HVAC. It excludes custom cabinetry, load-bearing wall changes, and foundation work, so two bids at that rate can still sit $80K apart.

How much do permits and inspections add to a whole-home remodel?

Budget 1 to 2% of project value. A whole-home remodel pulls 5 to 10 permits and 15 to 25 inspections in Jefferson County, and each one must be scheduled and passed before the next trade starts. We file every permit and schedule the inspections.

How do I know if a remodel bid is too low?

Compare scope line by line, not totals. If one bid omits the panel, the HVAC, the drywall hang, or the final paint, the low number is not a better price. Ask each contractor for the drawing or cut list they priced from.

Can I phase a whole-home remodel to spread the cost?

Yes. We phase by floor and room so one zone stays livable while we work the next, which keeps a family in place and splits the draw schedule across months. Projects over $200K or longer than four months usually need that plan.

Get a real number

Ballpark in 60 seconds.

Our cost calculator uses Louisville-specific data. Walk through 4 questions and get a range based on real Louisville project bids from 2024-2025.

Try the Cost Calculator

Or skip the calculator and schedule a free 30-minute in-home consultation, we will walk your actual space and give you a real range within a week.

Ready to talk about your full home remodel project?

Free 30-minute consultation. Real Louisville pricing, real timeline.

Schedule a Free Consult