Lake Forest Master Bath Refresh
A Lake Forest primary bath that did not need to be rebuilt as much as it needed to be brought back to current.
A Lake Forest primary bath that did not need to be rebuilt as much as it needed to be brought back to current. The shower was the real problem: an older pan and whatever waterproofing was behind the tile, which is the part nobody sees until it fails and takes the floor below it with it. The rest was a dated but structurally sound bathroom, a vanity that could be refreshed instead of replaced, and tile that had run its course.
We separated the work into what had to be done right and what could be refreshed.
We separated the work into what had to be done right and what could be refreshed. The shower was gutted to the studs and rebuilt with full new waterproofing, because a shower that fails is the most expensive thing in a bathroom to get wrong. The vanity was refreshed rather than replaced, which kept the budget in the shower where it belonged. New tile throughout tied the room back together so the refreshed vanity did not read as the old piece in a new room.
From our camera roll.
What we built
- Shower gutted and rebuilt with full new waterproofing
- New tile in the shower and on the floor
- Vanity refreshed rather than replaced
- New fixtures and shower trim
- Existing layout unchanged
A bathroom that was not remodeled for the sake of remodeling.
A bathroom that was not remodeled for the sake of remodeling. The shower got the money because the shower is the part that will fail if you do not, and the vanity kept its place because replacing a sound vanity would have bought nothing a refresh did not.
Related projects
Ready for your project?
Free consultation. Honest budget range. Talk to Zach directly.
Schedule a Free Consultation